THE NEXT STEP

What the first phase funds.

A FEASIBLE FIRST MODULE

One technically realisable module, scoped so it can be built and assessed on its own rather than as a fraction of the whole corridor.

A FEASIBLE FIRST MODULE

One technically realisable module, scoped so it can be built and assessed on its own rather than as a fraction of the whole corridor.

A CLASS 4/5 COST ESTIMATE

A costed range at the accuracy this stage supports, replacing the concept figures with something an investment committee can test.

A CLASS 4/5 COST ESTIMATE

A costed range at the accuracy this stage supports, replacing the concept figures with something an investment committee can test.

A CONSTRUCTION AND SUPPLY-CHAIN STRATEGY

How the module gets built and by whom: fabrication base, marine spread, materials and the sequence they arrive in.

A CONSTRUCTION AND SUPPLY-CHAIN STRATEGY

How the module gets built and by whom: fabrication base, marine spread, materials and the sequence they arrive in.

AN EU SUBSIDY AND GUARANTEE MODEL

Which European instruments the module qualifies for, and what public catalytic capital would have to carry before private capital commits.

AN EU SUBSIDY AND GUARANTEE MODEL

Which European instruments the module qualifies for, and what public catalytic capital would have to carry before private capital commits.

A ROLE SPLIT FOR THE CONSORTIUM

Who holds which risk in the phase that follows, so the follow-on consortium starts from a defined structure rather than a negotiation.

A ROLE SPLIT FOR THE CONSORTIUM

Who holds which risk in the phase that follows, so the follow-on consortium starts from a defined structure rather than a negotiation.

Create a free website with Framer, the website builder loved by startups, designers and agencies.